Обновите ваш браузер для правильного отображения этого сайта.Обновить мой браузер
On December 15, MS-21-310 with PD-14 engines made its first flight in Irkutsk.
The flight task envisaged testing of the engine unit operation modes, the aircraft stability and controllability, as well as the operation of its systems.
The flight duration was 1 hour 25 minutes.
https://sdelanounas.ru/blogs/138100/